{
  "record_id": "ptc-brandon-hetrick-pump-track-builds",
  "collection": "Pump Track Chat",
  "subseries": null,
  "episode_number": null,
  "dossier_type": "Interview Dossier",
  "recording_type": [
    "on-location interview",
    "technical conversation",
    "community-development interview"
  ],
  "title": "Pump Track Builds with Brandon Hetrick",
  "published_title": "Pump Track Chat — Pump Track Builds w/ Brandon Hetrick — Hosted by: Kyle A. Huffman",
  "source_url": "https://www.youtube.com/@LititzBMX17543",
  "source_url_status": "individual canonical URL not supplied",
  "host": "Kyle A. Huffman",
  "guests": [
    "Brandon Hetrick"
  ],
  "participants": [
    "Kyle A. Huffman",
    "Brandon Hetrick"
  ],
  "duration": "21:06",
  "recording_date": null,
  "publication_date": null,
  "location": "On location at a pump-track build; the title materials connect the discussion to Coleman Bike Park / Lebanon County",
  "language": "en",
  "summary": "Brandon Hetrick discusses his background building BMX tracks, skateparks, pump tracks, and event features; community planning; ADA-friendly and adaptive-rider considerations; construction timing; drainage; tourism; local-business effects; and the potential for a Lititz pump track.",
  "historical_significance": "Preserves builder testimony used to inform the Warwick Township advocacy effort and documents the practical, recreational, accessibility, and economic dimensions of pump-track development.",
  "subjects": [
    "Brandon Hetrick",
    "pump-track construction",
    "Coleman Bike Park",
    "Lebanon County",
    "ADA-friendly design",
    "adaptive riders",
    "drainage",
    "asphalt",
    "tourism",
    "local business",
    "Lititz"
  ],
  "transcript_status": "Original machine transcript preserved unchanged; corrected machine transcript added separately; audio and speaker verification pending.",
  "preservation_status": [
    "source-captured",
    "dossier-compiled",
    "documentation-gap-recorded",
    "transcript-verification-pending"
  ],
  "rights": "All rights reserved unless separately documented; see docs/rights-and-access.md.",
  "compiled_date": "2026-07-21",
  "build_version": "1.1.0-part1",
  "notes": [
    "Technical estimates and statements remain attributed to Brandon Hetrick and are not municipal engineering findings.",
    "The corrected machine transcript normalizes obvious Lititz, Fulton Bank, and Felicia Stancil references; unresolved wording remains marked or unchanged."
  ],
  "repository_path": "collections/pump-track-chat/records/ptc-brandon-hetrick-pump-track-builds",
  "source_image_original_filename": "2026-07-21_01-04-06.png",
  "source_image_sha256": "7fb27879882ca685540324ed13fa7f6a38d3980508e4da94ab5b3be0e4ff4f15",
  "related_record_ids": [
    "../ptc-warwick-public-comment-rehearsal/README.md",
    "../ptc-warwick-follow-up/README.md",
    "unb-possible-early-radical-rick-art"
  ]
}
